Semi and oversized load wedged on Oregon bridge
Posted 2022-03-15 18:12:25
0
13K
Two truck drivers ran into trouble and temporarily blocked both lanes of a bridge on Monday.
The Port of Hood River reported the incident at 1 p.m. on the Hood-River White Salmon Interstate bridge (also known as the Hood River Bridge) on Monday.
Authorities said that two trucks “wrecked” on the bridge, blocking traffic in both lanes.
The bridge reopened shortly before 2 p.m.
According to the Port of Hood River, the Hood River Bridge was built in 1924, rebuilt in 1938, and has narrow lanes measuring 9 feet, 4 inches. The bridge connects Hood River, Oregon with White Salmon and Bingen in Washington State.
Wide loads are not permitted without making special arrangements with authorities. Pilot vehicles and flaggers are required.
Search
Sponsored
Categories
Read More
Lawmakers advance bill to keep truckers in the right lane during snowstorms
This week, Virginia lawmakers moved forward with legislation drafted in response to a weather...
Police Issue Defective Equipment Citations After Cement Tanker Trailer Detaches From Tractor, Shutting Down Major Intersection in Lexington, South Carolina
LEXINGTON, SOUTH CAROLINA — A major intersection in Lexington was blocked for several hours...
Trucker Moves Burning Semi Away from Fuel Pumps at Connecticut Truck Stop
Firefighters in Milford, Connecticut, responded to a semi-truck fire at a local truck stop...
Police say parking dispute led to fatal trucker vs. trucker shooting at PA truck stop
Pennsylvania State Police (PSP) have released more information on an early morning truck stop...
Tow Truck Driver Hailed as “Hero” After Spotting Unresponsive Man “Bobbing” in Drainage Culvert, and Rescuing Him From Icy Water
SEAGOVILLE, Texas — A Seagoville tow truck driver is being credited with helping save a...