Semi and oversized load wedged on Oregon bridge

0
11K


Two truck drivers ran into trouble and temporarily blocked both lanes of a bridge on Monday.

The Port of Hood River reported the incident at 1 p.m. on the Hood-River White Salmon Interstate bridge (also known as the Hood River Bridge) on Monday.

 

Authorities said that two trucks “wrecked” on the bridge, blocking traffic in both lanes.

The bridge reopened shortly before 2 p.m.

 

According to the Port of Hood River, the Hood River Bridge was built in 1924, rebuilt in 1938, and has narrow lanes measuring 9 feet, 4 inches. The bridge connects Hood River, Oregon with White Salmon and Bingen in Washington State.

Wide loads are not permitted without making special arrangements with authorities. Pilot vehicles and flaggers are required.

 

 


Wow
2
Search
Sponsored
Categories
Read More
Trucking News
More than a ton of marijuana discovered in truck’s load of foam pool toys
Officers with U.S. Customs and Border Protection’s (CBP) Office of Field Operations...
By MEGA MISTAKES 2022-05-20 12:45:26 0 11K
Trucking News
Truck driver scores $1 million jackpot in Michigan Lottery game
An Illinois-based truck driver passing through Michigan changed his life forever when he...
By MEGA MISTAKES 2022-06-30 13:53:27 0 11K
Trucking News
Driver falls asleep hauling carnival rides, catches whole load on fire
A truck full of carnival rides caught fire in Kansas on Wednesday morning after the driver fell...
By MEGA MISTAKES 2021-08-27 13:11:53 0 12K
Trucking News
OOIDA tells feds that driver shortage is a ‘myth’ created to maintain cheap labor supply
A major trucking trade group recently told the U.S. Department of Commerce that high turnover is...
By MEGA MISTAKES 2021-08-25 14:06:25 0 10K
Trucking News
VIDEO: CMV struck by lightning during Missouri thunderstorm
The moment that lightning struck a Highway Department truck was captured by security cameras in...
By MEGA MISTAKES 2024-03-25 18:44:50 0 7K