-
- EXPLORE
-
-
-
-
-
-
-
-
Semi and oversized load wedged on Oregon bridge
Posted 2022-03-15 18:12:25
0
11K

Two truck drivers ran into trouble and temporarily blocked both lanes of a bridge on Monday.
The Port of Hood River reported the incident at 1 p.m. on the Hood-River White Salmon Interstate bridge (also known as the Hood River Bridge) on Monday.
Authorities said that two trucks “wrecked” on the bridge, blocking traffic in both lanes.
The bridge reopened shortly before 2 p.m.
According to the Port of Hood River, the Hood River Bridge was built in 1924, rebuilt in 1938, and has narrow lanes measuring 9 feet, 4 inches. The bridge connects Hood River, Oregon with White Salmon and Bingen in Washington State.
Wide loads are not permitted without making special arrangements with authorities. Pilot vehicles and flaggers are required.

Search
Sponsored
Categories
Read More
Out of control semi leaves plywood scattered in massive trail
Four people were hurt and a truck driver was cited after he lost control on a ramp in Louisiana...
VIDEO: Big rig boat steals the show at New Jersey boat parade
A boat masquerading as a semi truck turned heads and won the competition in its category at the...
Trucking company facing liability for 23,000 gallon diesel leak into Ohio creek
A trucking company’s mistake has led to a considerable diesel spill in Ohio, causing...
Trucker guilty of arson for ‘maliciously’ torching multiple Swift Transportation trailers in California
On Tuesday, a Michigan-based trucker accused of torching multiple Swift Transportation trailers...
Border Patrol intercepts big rig with 149 people locked inside
U.S. Border Patrol recently uncovered a major human smuggling attempt near Laredo, Texas.
The...